Tuesday, September 27, 2005

Post # 020 Rainfall data at Freshwater, IoW, UK

Friday, September 23, 2005

Post # 019 Bathroom Progress


Post # 018 Min & Max + Picture

Taken at 11:22 on 23 Sept 2005




Tuesday, September 20, 2005

Post # 017 Rainfall data at Freshwater, IoW, UK

Monday, September 19, 2005

Post # 016 Min & Max readings

Freshwater Bay
11:35 BST 16 Sept 2005



Thursday, September 15, 2005

Post # 015 The walls are down!


Alot more mess , dust and dirt but it is progress!

Tuesday, September 13, 2005

Post # 014 New rainfall data

Sunday, September 11, 2005

Post # 013 Freshwater Bay pictures

Taken at 10:50 bst on 9 Sept 2005

Saturday, September 10, 2005

Post # 012 Min & Max Temperature @ Freshwater

Friday, September 09, 2005

Post # 011 I start the bathroom makeover



The third of September saw the start of the bathroom makeover. Is this too much for me? Only time will tell.

First a composite picture before I started.





The first job is to remove the bath. This was much too heavy for me so it had to be cut into four pieces.

Each piece was just about all I could lift but the job was done.

The shower unit, the tiles, the plaster all had to be removed
The walls are made of plaster board and will not withstand the blast of water from the power shower. I will replace this with new tile backing boards

Tuesday, September 06, 2005

Post # 010

Saturday, September 03, 2005

Post # 009


Here are the Min & Max readings for the week begining 26 Aug 2005. The pictures below looking South east and South west were taken at 10:30 bst on 2 Sept 2005.